Efficiency of project health checks (PHCs) as an early warning system in practice: a case study in Norway telecommunication industry

Journal article


Hajikazemi, S. and Andersen, B (2014). Efficiency of project health checks (PHCs) as an early warning system in practice: a case study in Norway telecommunication industry. International Journal of Managing Projects in Business. 7 (4), pp. 678-700. https://doi.org/10.1108/IJMPB-01-2014-0012
AuthorsHajikazemi, S. and Andersen, B
Abstract

Purpose
– The purpose of this paper is to present an overview on the concept of early warning (EW) signs in projects, briefly introduce the project health check (PHC) tool, and evaluate the level of efficiency of this tool as a source of data for an EW approach signaling that a project is about to experience problems in the future.

Design/methodology/approach
– Two case projects from the telecommunication industry which have implemented the PHC system were investigated in order to observe how the use of this approach can help indicate EW signs which arise in projects and specify the area in which the problem is about to occur. A combination of qualitative and quantitative research methods has been implemented.

Findings
– The results show that although the application of PHC tool can to a certain extent contribute to identification of EW signs in projects but level of effectiveness of the PHC this tool as an EW system is dependent on several factors such as level of complexity of the project, average experience of project managers, etc. Also the empirical studies reveal that there is definitely potential for enhancement of the tool in order to improve its utilization as an EW system.

Research limitations/implications
– The research is limited to a single organization in the telecommunication industry. The projects are within the execution phase and the final outcomes of the projects are yet not acquired.

Practical implications
– The empirical case studies were developed to illustrate the level of efficiency of the use of PHC tool in projects and show how this tool can be used in order to better realize the potential problems timely enough to take preventive actions.

Originality/value
– This paper highlights the gap in the literature concerning the practical use of PHC/project health indicator tool as an EW system. It offers a new idea on how PHC tool can be used as an effective EW system and shed light on the factors which influence the reliability and validity of the data obtained via this tool in project. This paper is intended to be primarily of use to project management practitioners and practically oriented academics who are interested in developing fresh insights into new approaches for better management of projects.

Year2014
JournalInternational Journal of Managing Projects in Business
Journal citation7 (4), pp. 678-700
PublisherEmerald
ISSN1753-8378
Digital Object Identifier (DOI)https://doi.org/10.1108/IJMPB-01-2014-0012
Publication dates
Print26 Aug 2014
Publication process dates
Deposited05 Mar 2019
Accepted11 Apr 2014
Accepted author manuscript
License
Permalink -

https://openresearch.lsbu.ac.uk/item/877ww

  • 109
    total views
  • 125
    total downloads
  • 2
    views this month
  • 2
    downloads this month

Export as

Related outputs

To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents?
Chen, Y., Wu, Y., Hajikazemi, S., Yao, H. and Ebohon, O. (2022). To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents? CIB WBC 2022. RMIT, Melborune, Australia 27 - 30 Jun 2022
Sexism and Project Studies: The Case of Construction and Engineering Organizations
Hajikazemi, S. and Locatelli, G. (2021). Sexism and Project Studies: The Case of Construction and Engineering Organizations. European Academy of Management. Montreal 16 - 18 Jun 2021
Making Tomorrow a More Resilient Place: On Black Swans in The Project-Based Firm
Hajikazemi, S. and Walton, A.J. (2020). Making Tomorrow a More Resilient Place: On Black Swans in The Project-Based Firm. European Academy of Management. Dublin 04 - 06 Dec 2020
Normalising deviance in construction project organizations: a case study on the collapse of Carillion
Hajikazemi, S., Aaltonen, K., Ahola, T., Aarseth, W. and Andersen, B. (2020). Normalising deviance in construction project organizations: a case study on the collapse of Carillion. Construction Management and Economics. https://doi.org/10.1080/01446193.2020.1804069
Normalization of deviance in the construction industry, a managerial perspective
Hajikazemi, S., Ahola, T, Aaltonen, K, Aarseth, W and Andersen, B (2019). Normalization of deviance in the construction industry, a managerial perspective. EURAM 2019: Exploring the future of management. Lisbon, Portugal 26 - 28 Jun 2019
Overcoming barriers against interaction on innovation capabilities within and between smes
Hajikazemi, S., Ekambaram, A, Røstad, CC and Henriksen, B (2018). Overcoming barriers against interaction on innovation capabilities within and between smes. Moon, Ilkyeong, Lee, Gyu M, Park, Jinwoo, Kiritsis, Dimitris and Cieminski, Gregor von (ed.) IFIP WG 5.7 International Conference. Seoul, Korea 26 - 30 Aug 2018 Springer. https://doi.org/10.1007/978-3-319-99704-9_28
Analyzing electrical installation labor productivity through work sampling
Hajikazemi, S., Andersen, B and Langlo, JA (2017). Analyzing electrical installation labor productivity through work sampling. International Journal of Productivity and Performance Management. 66 (4), pp. 539-553. https://doi.org/10.1108/IJPPM-06-2016-0122
Downfall in the Oil Price; Challenges and Opportunities for the Construction Industry
Hajikazemi, S., Olsson, N, Ekambaram, A, Andersen, B and Langlo, JA (2017). Downfall in the Oil Price; Challenges and Opportunities for the Construction Industry. 9th Nordic Conference on Construction Economics and Organization. Goteborg, Sweden 12 - 14 Jun 2017
Value Co-creation through Early Warning Signs in a Project Setting
Hajikazemi, S., Razmdoost, K and Smyth, H (2017). Value Co-creation through Early Warning Signs in a Project Setting. European Academy of Management (EURAM). Glasgow, Scotland 21 - 24 Jun 2017
The Black Swan – Knowing the Unknown in Projects
Hajikazemi, S., Ekambaram, A, Andersen, B and Zidane, YJ-T (2016). The Black Swan – Knowing the Unknown in Projects. Procedia - Social and Behavioral Sciences. 226, pp. 184-192. https://doi.org/10.1016/j.sbspro.2016.06.178
Remedies for Managing Bottlenecks and Time Thieves in Norwegian Construction Projects – Public vs Private Sector
Eik-Andresen, P, Landmark, AD, Hajikazemi, S., Johansen, A and Andersen, B (2016). Remedies for Managing Bottlenecks and Time Thieves in Norwegian Construction Projects – Public vs Private Sector. Procedia - Social and Behavioral Sciences. 226, pp. 343-350. https://doi.org/10.1016/j.sbspro.2016.06.197
Barriers against effective responses to early warning signs in projects
Hajikazemi, S., Andersen, B and Klakegg, OJ (2015). Barriers against effective responses to early warning signs in projects. International Journal of Project Management. 33 (5), pp. 1068-1083. https://doi.org/https://www.doi.org/10.1016/j.ijproman.2015.01.002
The Early Warning Procedure in an International Context
Hajikazemi, S., Andersen, B, Eleftheriadis, R and Capellan, A (2015). The Early Warning Procedure in an International Context. Procedia - Social and Behavioral Sciences. 194, pp. 85-95. https://doi.org/https://www.doi.org/10.1016/j.sbspro.2015.06.122
Detecting Early Warning Signs of Delays in Shipbuilding Projects
Hajikazemi, S., Arica, E, Semini, M, Andersen, B and Alfnes, E (2015). Detecting Early Warning Signs of Delays in Shipbuilding Projects. Advances in production management systems. Tokyo 07 - 09 Sep 2015
Identification of Early Warning Signs in Front-End Stage of Projects, an Aid to Effective Decision Making
Hajikazemi, S., Andersen, B and Krane, HP (2013). Identification of Early Warning Signs in Front-End Stage of Projects, an Aid to Effective Decision Making. Procedia - Social and Behavioral Sciences. 74, pp. 212-222. https://doi.org/https://www.doi.org/10.1016/j.sbspro.2013.03.011
Application of performance measurement as an early warning system
Hajikazemi, S. and Andersen, B (2013). Application of performance measurement as an early warning system. International Journal of Managing Projects in Business. 6 (4), pp. 714-738. https://doi.org/https://www.doi.org/10.1108/IJMPB-04-2012-0015
A Review on Possible Approaches for Detecting Early Warning Signs in Projects
Hajikazemi, S., Andersen, B and Krane, HP (2013). A Review on Possible Approaches for Detecting Early Warning Signs in Projects. Project Management Journal. 44 (5), pp. 55-69. https://doi.org/https://www.doi.org/10.1002/pmj.21360
A Conceptual Framework for Application of Performance Measurement as an Early Warning System in Projects, an Analysis on the Case of the London Ambulance Service Project
Hajikazemi, S., Andersen, B and Krane, HP (2012). A Conceptual Framework for Application of Performance Measurement as an Early Warning System in Projects, an Analysis on the Case of the London Ambulance Service Project. PMI® Research and Education Conference. Limerick, Ireland 15 - 18 Jul 2012
Preliminary Investigation of Project Success Criteria in Norway
Hajikazemi, S., Hussein, B and Ramazany, S (2011). Preliminary Investigation of Project Success Criteria in Norway. The 6th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications. Prague 15 - 17 Sep 2011