The Black Swan – Knowing the Unknown in Projects

Journal article


Hajikazemi, S., Ekambaram, A, Andersen, B and Zidane, YJ-T (2016). The Black Swan – Knowing the Unknown in Projects. Procedia - Social and Behavioral Sciences. 226, pp. 184-192. https://doi.org/10.1016/j.sbspro.2016.06.178
AuthorsHajikazemi, S., Ekambaram, A, Andersen, B and Zidane, YJ-T
Abstract

A “Black Swan” is produced when the gap between what we know and what we think we know becomes dangerously wide (Taleb, 2007). This concept is closely related to uncertainty and learning. A Black Swan event is usually a surprise, at least to the observer. However the Black Swan event very much depends on the observer. What may be a Black Swan surprise for a turkey is not a Black Swan surprise to its butcher; so the main objective is to “avoid being the turkey” by exploring and identifying areas of vulnerability in order to avoid surprises. In projects, while some may disagree, almost all failures, even catastrophic ones, are not really Black Swan events but a series of failures that alone may have a negative impact on project outcomes but combined lead to catastrophic failure. However it is surprising how often experienced project teams ignore the early warning signs and move forward into the project lifecycle despite serious problems in many areas that are keys to project success. This will ultimately lead to the Black Swan event materializing. That is when it is too late to take any preventive actions. This paper will characterize the Black Swan concept in projects and describe its nature and identify organizational mechanisms that can be useful in dealing with Black Swan surprises in projects. This study is mainly based on literature study, however carries out an assessment on examples of Black Swan events in order to better clarify the concept under study.

Year2016
JournalProcedia - Social and Behavioral Sciences
Journal citation226, pp. 184-192
PublisherElsevier
ISSN1877-0428
Digital Object Identifier (DOI)https://doi.org/10.1016/j.sbspro.2016.06.178
Publication dates
Print29 Jul 2016
Publication process dates
Deposited02 Jan 2019
Accepted29 Jul 2016
Publisher's version
License
File Access Level
Open
Permalink -

https://openresearch.lsbu.ac.uk/item/87307

Download files


Publisher's version
Black Swan.pdf
License: CC BY-NC-ND 4.0
File access level: Open

  • 312
    total views
  • 358
    total downloads
  • 1
    views this month
  • 3
    downloads this month

Export as

Related outputs

To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents?
Chen, Y., Wu, Y., Hajikazemi, S., Yao, H. and Ebohon, O. (2022). To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents? CIB WBC 2022. RMIT, Melborune, Australia 27 - 30 Jun 2022
Sexism and Project Studies: The Case of Construction and Engineering Organizations
Hajikazemi, S. and Locatelli, G. (2021). Sexism and Project Studies: The Case of Construction and Engineering Organizations. European Academy of Management. Montreal 16 - 18 Jun 2021
Making Tomorrow a More Resilient Place: On Black Swans in The Project-Based Firm
Hajikazemi, S. and Walton, A.J. (2020). Making Tomorrow a More Resilient Place: On Black Swans in The Project-Based Firm. European Academy of Management. Dublin 04 - 06 Dec 2020
Normalising deviance in construction project organizations: a case study on the collapse of Carillion
Hajikazemi, S., Aaltonen, K., Ahola, T., Aarseth, W. and Andersen, B. (2020). Normalising deviance in construction project organizations: a case study on the collapse of Carillion. Construction Management and Economics. https://doi.org/10.1080/01446193.2020.1804069
Normalization of deviance in the construction industry, a managerial perspective
Hajikazemi, S., Ahola, T, Aaltonen, K, Aarseth, W and Andersen, B (2019). Normalization of deviance in the construction industry, a managerial perspective. EURAM 2019: Exploring the future of management. Lisbon, Portugal 26 - 28 Jun 2019
Overcoming barriers against interaction on innovation capabilities within and between smes
Hajikazemi, S., Ekambaram, A, Røstad, CC and Henriksen, B (2018). Overcoming barriers against interaction on innovation capabilities within and between smes. Moon, Ilkyeong, Lee, Gyu M, Park, Jinwoo, Kiritsis, Dimitris and Cieminski, Gregor von (ed.) IFIP WG 5.7 International Conference. Seoul, Korea 26 - 30 Aug 2018 Springer. https://doi.org/10.1007/978-3-319-99704-9_28
Analyzing electrical installation labor productivity through work sampling
Hajikazemi, S., Andersen, B and Langlo, JA (2017). Analyzing electrical installation labor productivity through work sampling. International Journal of Productivity and Performance Management. 66 (4), pp. 539-553. https://doi.org/10.1108/IJPPM-06-2016-0122
Downfall in the Oil Price; Challenges and Opportunities for the Construction Industry
Hajikazemi, S., Olsson, N, Ekambaram, A, Andersen, B and Langlo, JA (2017). Downfall in the Oil Price; Challenges and Opportunities for the Construction Industry. 9th Nordic Conference on Construction Economics and Organization. Goteborg, Sweden 12 - 14 Jun 2017
Value Co-creation through Early Warning Signs in a Project Setting
Hajikazemi, S., Razmdoost, K and Smyth, H (2017). Value Co-creation through Early Warning Signs in a Project Setting. European Academy of Management (EURAM). Glasgow, Scotland 21 - 24 Jun 2017
Remedies for Managing Bottlenecks and Time Thieves in Norwegian Construction Projects – Public vs Private Sector
Eik-Andresen, P, Landmark, AD, Hajikazemi, S., Johansen, A and Andersen, B (2016). Remedies for Managing Bottlenecks and Time Thieves in Norwegian Construction Projects – Public vs Private Sector. Procedia - Social and Behavioral Sciences. 226, pp. 343-350. https://doi.org/10.1016/j.sbspro.2016.06.197
Barriers against effective responses to early warning signs in projects
Hajikazemi, S., Andersen, B and Klakegg, OJ (2015). Barriers against effective responses to early warning signs in projects. International Journal of Project Management. 33 (5), pp. 1068-1083. https://doi.org/https://www.doi.org/10.1016/j.ijproman.2015.01.002
The Early Warning Procedure in an International Context
Hajikazemi, S., Andersen, B, Eleftheriadis, R and Capellan, A (2015). The Early Warning Procedure in an International Context. Procedia - Social and Behavioral Sciences. 194, pp. 85-95. https://doi.org/https://www.doi.org/10.1016/j.sbspro.2015.06.122
Detecting Early Warning Signs of Delays in Shipbuilding Projects
Hajikazemi, S., Arica, E, Semini, M, Andersen, B and Alfnes, E (2015). Detecting Early Warning Signs of Delays in Shipbuilding Projects. Advances in production management systems. Tokyo 07 - 09 Sep 2015
Efficiency of project health checks (PHCs) as an early warning system in practice: a case study in Norway telecommunication industry
Hajikazemi, S. and Andersen, B (2014). Efficiency of project health checks (PHCs) as an early warning system in practice: a case study in Norway telecommunication industry. International Journal of Managing Projects in Business. 7 (4), pp. 678-700. https://doi.org/10.1108/IJMPB-01-2014-0012
Identification of Early Warning Signs in Front-End Stage of Projects, an Aid to Effective Decision Making
Hajikazemi, S., Andersen, B and Krane, HP (2013). Identification of Early Warning Signs in Front-End Stage of Projects, an Aid to Effective Decision Making. Procedia - Social and Behavioral Sciences. 74, pp. 212-222. https://doi.org/https://www.doi.org/10.1016/j.sbspro.2013.03.011
Application of performance measurement as an early warning system
Hajikazemi, S. and Andersen, B (2013). Application of performance measurement as an early warning system. International Journal of Managing Projects in Business. 6 (4), pp. 714-738. https://doi.org/https://www.doi.org/10.1108/IJMPB-04-2012-0015
A Review on Possible Approaches for Detecting Early Warning Signs in Projects
Hajikazemi, S., Andersen, B and Krane, HP (2013). A Review on Possible Approaches for Detecting Early Warning Signs in Projects. Project Management Journal. 44 (5), pp. 55-69. https://doi.org/https://www.doi.org/10.1002/pmj.21360
A Conceptual Framework for Application of Performance Measurement as an Early Warning System in Projects, an Analysis on the Case of the London Ambulance Service Project
Hajikazemi, S., Andersen, B and Krane, HP (2012). A Conceptual Framework for Application of Performance Measurement as an Early Warning System in Projects, an Analysis on the Case of the London Ambulance Service Project. PMI® Research and Education Conference. Limerick, Ireland 15 - 18 Jul 2012
Preliminary Investigation of Project Success Criteria in Norway
Hajikazemi, S., Hussein, B and Ramazany, S (2011). Preliminary Investigation of Project Success Criteria in Norway. The 6th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications. Prague 15 - 17 Sep 2011